Lake Cahoon Road Bridge Replacement

The Lake Cahoon Bridge replacement project calls for a total superstructure replacement of a multi-span concrete bridge approximately 400 feet long.  The project duration is anticipated to be a year and is projected to cost 2.5 million dollars.