Overview:
This is Phase 2 of a multiphase Master Plan to connect Downtown Suffolk with Chesapeake. This phase of the trail is a 10' multi-use trail constructed along the former Seaboard Coastline Rail Corridor and connects Suburban Drive to Nansemond Parkway.
Project Manager: Helen Gabriel
Phone: 757-514-7255
Budget
Preliminary Engineering: $196,642
Right of Way: $0
Construction: $1,158,641
Total Budget: $1,355,283
Estimate: Funded with Highway Safety Improvement Program (HSIP) Funds
Timeline
Preliminary Engineering: 01/2019 – 05/2020
Right of Way: N/A
Construction: 05/2020 – 3/31/2021