Suffolk Seaboard Coastline Trail Phase II

Overview:

This is Phase 2 of a multiphase Master Plan to connect Downtown Suffolk with Chesapeake.  This phase of the  trail is a 10' multi-use trail constructed along the former Seaboard Coastline Rail Corridor and connects Suburban Drive to Nansemond Parkway.


Project Manager: Helen Gabriel

Phone: 757-514-7255



Budget

Preliminary Engineering: $196,642

Right of Way: $0

Construction: $1,158,641

Total Budget: $1,355,283


Estimate: Funded with Highway Safety Improvement Program (HSIP) Funds 


Timeline

Preliminary Engineering: 01/2019 – 05/2020

Right of Way: N/A

Construction: 05/2020 – 3/31/2021