Current Projects

PROJECT UPDATES

EAST WASHINGTON BRIDGE REPLACEMENT STARTS

CIP Buttons

ROUTE 58 HOLLAND ROAD WIDENING

Project Update Button

CAROLINA ROAD BRIDGE REPLACEMENT OPENING SOON

Carolina Bridge Update Button

IMG_0463

CAROLINA ROAD BRIDGE REPLACEMENT

Replacing the bridge structure on Carolina Road (Rte. 32) over Cypress Swamp. 

Right turn lanes will be installed to Governors Point Drive (1)

CRITTENDEN ROAD

Realign the existing intersection of Crittenden Road (Route 628) and Bridge Road (Route 17) with Clubhouse Drive to create a new four-way signalized intersection.

downtown

DOWNTOWN SUFFOLK DRAINAGE IMPROVEMENTS

The purpose of Downtown Suffolk Drainage Improvements project is to reduce flooding that occurs during a normal rain even in the downtown area including Jackson St, S Saratoga St, and W Washington St.

Manning Bridge Rd - Route 58 Improvements

MANNING BRIDGE ROAD / ROUTE 58 INTERSECTION

Improvements at Route 58/Manning Bridge Road Intersection.  Design will accommodate a new connector road between Route 58 and Kenyon Road on the north side of the intersection.

NANSEMOND

NANSEMOND PARKWAY BRIDGE

Replacement of the superstructure with a single prestressed concrete voided slab supported on new concrete abutments.

CONNEE

NORTH SUFFOLK CONNECTOR STUDY

This new connection will provide an unimpeded route between Shoulders Hill Road and Nansemond Parkway to maintain adequate traffic flow between northern Suffolk and the Downtown Suffolk urban core.

PB

PORTSMOUTH BLVD SIDEWALK, PHASE I, II & III

Construct a 5ft sidewalk along the north side of Portsmouth Boulevard from Suburban Drive to Nansemond Parkway.

Location 1

ROUTE 58 HOLLAND ROAD WIDENING

The 3.1 mile widening project will provide for the construction of an additional travel lane both east bound and west bound from Route 58/13/32 bypass to approximately 0.7 miles west of Manning Bridge Road. 

Roadway Looking South

ELWOOD ROAD BRIDGE REPLACEMENT

Bridge replacement and minor roadway work to Elwood Road Bridge (Rte. 613) over Kingsale Swamp. 

East Elevation2 - Upstream

EAST WASHINGTON ST SUPERSTRUCTURE REPLACEMENT

Replacing the existing superstructure on East Washington Street (RTE. 337) Bridge over Jericho Canal.

Overpass Improvements Base Layout

NANSEMOND PARKWAY / WILROY RD OVERPASS

Realigning the intersection of Nansemond Parkway and Wilroy Road in order to provide a grade separated overpass for Nansemond Parkway over the Commonwealth Railway tracks.

Oldetown Drainage

OLDETOWN DRAINAGE

This Master Plan provides recommendations to replace and relocate infrastructure into the right-of-way (ROW) and to improve stormwater infrastructure to provide adequate capacity. The Master Plan also looks at rehabilitation options for system components in poor condition and has divided the project into six phases.

pr

PRUDENCE ROAD AT PRUDEN CENTER ENTRANCE

Intersection improvements at Pruden Boulevard (US 460) and Prudence Road to allow for left turn movements both north and south of Pruden Boulevard.

SHO

SHOULDERS HILL ROAD / ROUTE 17 BRIDGE ROAD

Widening of Route 17 from four to six lanes from approximately 2,000 feet west of the intersection to approximately 3,300 feet east of the intersection and the widening of Shoulders Hill Road from two to four lanes to approximately 1500 feet south of the intersection.

East Elevation - Upstream

FREEMAN MILL ROAD BRIDGE REPLACEMENT

Replace the bridge and perform minor roadwork on the Freeman Mill Bridge over Spivey Swamp (Structure #8049).

SHOULDERSHILL

SHOULDERS HILL ROAD MULTIUSE PATH

A 10 foot wide by 1,100 linear feet of shared use path along the east side of Shoulders Hill Road from Weatherby Way / Belmont Blvd. to Bennett's Creek Park Rd.

long

LONGSTREET LANE BRIDGE REPLACEMENT

Existing bridge and adjacent roadway approach will be dismantled and removed for the construction of the new bridge and roadway approach.

NANS

NANSEMOND PARKWAY / BENNETT'S PASTURE RD IMPROVEMENT

Improvements at the intersection of Nansemond Parkway and Sleepy Hole Road adjacent to Nansemond River High School.

PItchkettle Road Realignment

PITCHKETTLE ROAD REALIGNMENT 

To increase corridor safety for both pedestrians and drivers. The project will also enhance flow of traffic from Prentis St to Pitchkettle Rd while providing some much needed aesthetic improvements. 

Pughsville Area Drainage

PUGHSVILLE AREA DRAINAGE

Installing a drainage trunk line down John St from Townpoint Rd to the Outfall at the end of John St in Chesapeake. A stormwater pond will also be included South of Queen St.

tur

TURLINGTON ROAD CULVERTS REHABILITATION

Rehabilitate the culverts on Turlington Road over Kilby Creek. 

20220322_122015

PITTMANTOWN ROAD BRIDGE REPLACEMENT

Replace the bridge and perform minor roadwork on the Pittmantown Road Bridge over Mill Swamp (Structure #8051