Old College Drive Drainage Improvements

The project provides for the construction of drainage and ditch improvements along Old College Drive and Magnolia Drive. The ditches along Old College Drive will be replaced with an enclosed stormwater system. This project is anticipated to be completed in June of 2018.
 

Contact


  • Project Manager: Frank Grubbs
  • Phone Number: 757-514-7684

Map