Route 460 Improvements at Sadler Pond

This project will provide for the design and construction of upgrades to the culvert crossing under Route 460, downstream of the Sadler Pond dam. Upgrades to the existing crossing will provide the capacity to accommodate stormwater flow should the dam be breached or removed. This will be achieved through the installation of dual 10' x 4' culverts in addition to the existing 6' x 6' culvert currently underneath Route 460. The project is currently in the final design phase.

 