Review the proposed plans and learn more about the project. Project staff will be available to answer your questions.  

The meeting will be held in an open forum style with no formal presentation. This format will allow participants flexibility to discuss the proposed project one-on-one and meet directly with appropriate project staff members so that their specific questions can be addressed.

The following items will be available at the Public Hearing:

1. Design plan sheets

2. Public hearing brochure

3. Information regarding the tentative project schedule

4. Property impacts and right-of-way relocation assistance information

5. Environmental documents


Public Comments to be submitted by November 7, 2021 

Will be received at the meeting or they can be submitted in person or by mail by November 7, 2021 to Allan Mushett, 442 W. Washington Street, Suffolk VA 23434. 

You may also email your comments to gmushett@suffolkva.us. Please reference “Nansemond Parkway and Sleepy Hole Road Improvements” in the subject line.

Project Description

This project provides for infrastructure improvements at the intersection of Nansemond Parkway and Sleepy Hole Road adjacent to Nansemond River High School. Proposed roadway improvements include turn lanes and widening to all three approaches to the intersection of Sleepy Hole Road/ Nansemond Parkway, a new traffic signal, and relocation of the main entrance of Nansemond River High School to Sleepy Hole Road. Some improvements will be required to the Nansemond River High School Property to improve vehicular circulation in the parking lots. These improvements include providing additional parking, reconfiguring some of the drive aisles and the design of a new access road that will connect to Sleepy Hole Road approximately 750 feet north of the Sleepy Hole Road/ Nansemond Parkway intersection.  Additional improvements may include a closed drainage system on the south side of Nansemond Parkway from the Seaboard Coastline Railroad Right of Way to the existing Sidewalk in front of Nansemond River High School. 