The project will provide a 5ft sidewalk along the north side of Portsmouth Boulevard from Suburban Drive to Nansemond Parkway.  This project is under review of the 60% design drawings. Upon completion of this phase, the project will proceed toward the 90% design drawings, which should be finalized during the Spring, 2019