Turlington Road Bridge Replacement

The primary purpose of this project is to rehabilitate the culverts on Turlington Road over Kilby Creek. 

The existing structure is a triple barrel metal pipe culvert . New headwalls will be constructed and the existing pipes will be extended and re-lined. 

Rehabilitating this structure will improve the safety and efficiency of Suffolk’s roadways. 


Contact

  • Project Engineer: Ali Huazy  
  • Phone:  514-7712
  1. 1
  2. 2
  3. 3
  4. 4
  5. 5

Budget

Preliminary Engineering:         $64,000

Right of Way:         $9,000

Construction:         $672,000

Total:         $745,000


Timeline

January 2020 – Began Design

January 2022 – Right of Way Acquisition to Begin

March 2022 – Project Advertisement

June 2022 – Award Contract 

January 2023 – Planned Finish Date