UPDATE - August 31, 2022

A contractor will begin bridge improvements in the 2300 block of East Washington Street starting September 12, 2022.  This work will require lane closures resulting in moderate to heavy traffic. One lane of traffic is expected to be open throughout the project.

The City of Suffolk is planning for a replacement of the existing superstructure of East Washington Street (RTE. 337) Bridge over Jericho Canal. The superstructure will be replaced with prestressed concrete voided slabs utilizing the existing concrete superstructure. The cracked, delaminated, and spalled areas in the abutments and wingwalls will be repaired. 

Bridge Location

Contact

Bridge Full Set Plans

Plans

Timeline

September 2022 - Summer 2023