All new development must be located outside of the 100-foot Resource Protection Areas (RPA) buffer. Land development may only be allowed within the RPA if the project involves a water dependent facility, such as marinas or other boat docking structures, or shoreline erosion control structures. Flood control or stormwater management facilities may be located within the RPA only if certain conditions are satisfied.