Pughsville Area Drainage Improvements

UPDATE

January 5, 2022 Suffolk City Council approved authorization to acquire real property in fee simple and easements. 


The purpose of the project is to provide for some much needed drainage improvements in the Pughsville Area. This will be accomplished by installing a drainage trunk line down John Street from Townpoint Road to the Outfall at the end of John Street in Chesapeake. A stormwater pond will also be included South of Queen Street to help attenuate some of the flow going into Chesapeake. The stormwater pond will also provide some water quality credits for the project. With a portion of the project along John Street being in the City of Chesapeake it should be noted that coordination between the two municipalities is required.

Project Engineer:

Brochure

Capture

90% Plans

Pughsville 90% Plans

Overall Plan

Pughsville Drainage

Timeline:

Design:               January 2017 – March 2022

Right of Way:    March 2022 – December 2023

Construction:    December 2023 – May 2025


Budget: 

Design:               $789,200

Right of Way:    $2,788,909

Construction:    $4,122,797